Sunday 23 September, 2018

Temporary closure scheduled for Camden Road, Couva

Map provided by NIDCO.

Map provided by NIDCO.

A temporary road closure will be in effect at Camden Road, Couva, from this weekend and continue for a period of two weeks to facilitate the construction of approach roads for the new Bridge B1/1 Camden Road, Couva.

Construction is expected to begin on September 15 and end September 29.

The National Infrastructure Development Company Limited (NIDCO) said in the interest of public safety, a temporary road closure is required to facilitate the construction.

The public is advised to use the detour routes illustrated in the map.

• Traffic exiting the Sir Solomon Hochoy Highway using the Preysal/Balmain Overpass and heading west along the Couva Main Road can turn left onto Milton Road to get to Rivulet Road.

• Traffic exiting the Sir Solomon Hochoy Highway using Preysal/Balmain Overpass and heading west along the Rivulet Road can turn right at the traffic signals at Milton Road junction, and onto Milton Road to get to the Couva Main Road.

• Traffic heading east from Couva can continue along the Couva Main Road and turn right onto Milton Road to get to Rivulet Road.

• Traffic heading east along the Rivulet Road from the Point Lisas Roundabout can continue to the traffic signals at Milton Road, turn left onto Milton Road to get to the Couva Main Road.

NIDCO and its contractors are taking all necessary precautions to guarantee that proper Health, Safety and Environmental Standards are maintained.

 

Get the latest local and international news straight to your mobile phone for free:

Download the Loop News Caribbean app on Google Play Store: http://bit.ly/GetALoop

Download the Loop News Caribbean app on the App Store:  http://bit.ly/GetiLoop