Sunday 19 May, 2019

Traffic Alert: Major construction works along CRH for Easter weekend

Major construction works are carded for the Easter weekend along the eastbound lanes of the Churchill Roosevelt Highway near the Curepe Intersection. 

Works will begin at the site (located 100 metres east of the Curepe Intersection) at 5 am on Good Friday and is scheduled to be completed at 6 pm on Easter Monday. 

The National Infrastructure Development Company Limited (NIDCO) and the Works and Transport Ministry have advised that there will be one diversion in place affecting both eastbound and westbound traffic for the duration of these works.

There will be two-lane traffic in both directions at designated sections along the highway as a result of the diversion. 

The following alternative routes may be used to avoid the construction area:

Eastern Main Road via the Uriah Butler Highway

College Road via Southern Main Road (South), Trantrill Road, Freeman Road and Orange Grove Road 

Pasea Main Road via Southern Main Road (South), Trantrill Road, Freeman Road and Orange Grove Road and Trace 
 
Motorists are further advised to proceed with caution, comply with instructions issued by police officers on site to facilitate a safe and orderly flow of traffic, observe all temporary directional signage provided on the approaches to the site, reduce speed on approaching the work zone, and be aware of heavy equipment entering and exiting the site.

Get the latest local and international news straight to your mobile phone for free: